Every job is different. The actual cost goes way deeper than just the square footage of the slab.
Driveway size and layout change the plan; a straight single-car pull-in is basic; a wide double-car drive with a curved apron and side parking needs more mud, more guys, and more time on the trowel.
Surface condition dictates the prep work: a slab with heavy scaling, deep pits, oil spots, and old peeling sealer takes a lot more grinding and scrubbing than one with light wear.
The amount of damage you have right now determines exactly how much repair we have to do before that overlay can even touch the ground.
Finish selection, standard gray, broom texture, color, borders, affects the process and timeline.
Drainage or slope concerns can make resurfacing inadvisable until the grading issue is addressed.
And Buffalo weather and curing conditions matter: cold overnight temperatures, high humidity, rain, and direct sun all affect scheduling and curing quality.
We plan around those conditions rather than ignore them.